A single asset is associated with a task. That asset can be changed on the Task. Only open Asset Tasks without inspections qualify for this feature.

Changing the asset on the following types of tasks is not allowed:

  • Tasks that are completed or canceled
  • Tasks that have an inspection record started or completed

Users cannot switch the asset type associated with the task. A sign task can only be changed to apply to different signs. For example, this change is allowed:

A user creates a task to repair a Sign but incorrectly assigns Sign 123 instead of Sign 425. The user edits the open task to apply to Sign 425 and saves it. The task now applies to the correct sign.