Remaining Life Calculation

Remaining life is the amount of time it takes for an asset to reach its established minimum condition value based on the asset's individual performance curve and assigned condition group. The date on which an asset is expected to reach its minimum condition is available in the Act Before field. For remaining life to calculate, the asset must have a condition group, prediction group, and installed or replaced date.

In Cartegraph, the remaining life displays on:

  • Asset summary tool tip
  • Asset Detail view’s Overview header
  • Tasks associated to assets on the Summary tool tip’s Asset Detail tab.

Progress Bar

  • The progress bar is the index range of 0-100 index.
  • The marker represents the asset’s minimum condition.       
  • The bar indicates the Estimated OCI.

If the Estimated OCI is greater than the minimum condition, the bar is green. The estimated amount of remaining life is also displayed.

Screen Shot 2018-04-18 at 2.58.44 PM.png

If the Estimated OCI is less than or equal to the minimum condition, the bar is red. If the current date is on or after the Act Before date, Replace Now displays instead of the remaining life.

Screen Shot 2018-04-18 at 2.58.47 PM.png

If the asset does not have a minimum condition as defined by its Condition Group, the remaining life cannot be calculated, and Data Not Available displays. The progress bar displays the Estimated OCI if it can be calculated on a 0-100 scale.

Screen Shot 2018-04-18 at 2.58.51 PM.png

If the Estimated OCI cannot be calculated, the bar is empty and Data Not Available displays.

Screen Shot 2018-04-18 at 2.58.55 PM.png

 