Skip to main content
Cartegraph Campus

Perform a Cartegraph One Inspection

  1. From the Task list, tap on an Inspection task.
  2. Tap Screen Shot 2018-04-18 at 2.04.30 PM.png.
  3. Enter the Inspection Date and Inspected By fields.
  4. For each condition Category, use the slider to set the condition category ranking.
  5. Enter notes specific to the inspection.
  6. Tap Screen Shot 2018-04-17 at 3.41.17 PM.png.
  7. Tap Complete Inspection.
  • Was this article helpful?