Skip to main content
Cartegraph Campus

Structure Changes: Cartegraph Winter 2020 to Spring 2020

Changes

All Assets

  • Attachment Field: Length changed from 254 to 2000
  • Installed Field: Can read/write, changed from read-only
  • Replaced Field: Can read/write, changed from read-only
  • Retired Field: Can read/write, changed from read-only

Tasks

Playground Equipment specific fields remove during the upgrade if the client not formatted for Playground Equipment and field contains no data.

  • Corrective Measure Notes
  • Debris or Litter
  • Followup Work Required
  • Overgrown Vegetation
  • Proper Drainage
  • Protective Surface
  • Trash Emptied
  • Tripping Hazards
  • User Modified Equipment
  • Vandalism or Graffiti

Material Logs

(wdMaterialLog)

Update the Price Per Unit is set value to ROUND(cost / quantity, 2)

Where:

  • Transaction = Decrease Adjustment
  • Cost > 0
  • Quantity > 0
  • PricePerUnit IS NULL or PricePerUnit = 0