Task Detail Report

This report provides a detailed view of Tasks, including

  • Basic information including activity, asset, and start and stop dates.
  • Total of the Labor, Equipment, Material, and Other costs.
  • Itemized Labor, Equipment, Material, and Other entries and costs.
  • Total cost which is the sum of the Labor, Equipment, Material, and Other costs.

The detailed report may be used for billing or invoicing where itemized costs and other details are needed.

Run this report from the Detail, List, or Report views. From the Report view you are prompted to select the date range to show the tasks.

The Cost of Labor, Equipment, Materials, and Other is calculated based on the Resource logs for the specific task.

NOTE: The prompt for Tasks scheduled from and Tasks ending through; means the Start Date and Stop Date must be within the prompted for dates.

Example

If the prompted dates are 5/28/12–6/02/12

Tasks with the following Start and Stop dates are included:

  • 5/28/12–5/29/12
  • 5/30/12-6/1/12

Tasks with the following Start and Stop dates are not included:

  • 5/27/12–5/29/12
  • 5/29/12–6/3/12

 