Task Summary with Map Report

The report displays for each task:

  • Basic information including
    • Task ID
    • Activity
    • Asset (includes Asset Type and ID)
    • Status
    • Priority
    • Start Date
    • Stop Date
    • Location
      • If the task has a location, a map is printed.
      • If there is no location, the text Map Location Not Specified prints.
  • From the Index and Detail views, blank log entry rows are printed for allowing information to be entered by the field worker using this report:
    • Labor Log
    • Equipment Log
    • Material Log
    • Other Log

Run this report from the Detail, List, or Report view. From the Report view you are prompted to select the date range to show the tasks.

The prompt for Tasks starting from and Tasks ending through means the Start Date and Stop Date must be within the prompted for dates.

Example

If the prompted dates are 5/28/12–6/02/12

The following tasks are included:

  • 5/28/12–5/29/12
  • 5/30/12-6/1/12

The following tasks are included:

  • 5/27/12–5/29/12
  • 5/29/12–6/3/12

 